House extensions built from the ground up

Rear and side extensions across Sutton and London. We arrange the drawings and building control, build the structure and finish the room ready to use.

4.5 mNew kitchen

What is included

One team handles every stage below, so there is one quote and one person responsible.

Finished flat roof on a new rear extension
A flat-roof extension finished by our team

Drawings and approvals

We arrange architectural drawings, structural calculations and building control for your extension.

Groundwork and structure

Excavation, foundations, drainage, brickwork and steel beams to open up the back of the house.

Roof and glazing

Flat or pitched roofs, roof lanterns and Velux windows, ready for bi-fold or sliding doors.

First fix

Electrics and plumbing runs set out for your new kitchen or living space.

Plastering and floors

Insulation, plasterboard and skim, screed and floor finishes such as large-format porcelain.

Final finish

Decorating, snagging and a full clean before we hand the room back to you.

An extension, stage by stage

Photos from one of our recent rear extensions with a flat roof and roof lantern.

  1. Pouring the concrete slab

    1. Concrete slab

  2. Roof insulation around the roof lantern frame

    2. Roof insulation and lantern frame

  3. New OSB roof deck

    3. Roof deck

  4. Parapet wall and waterproof roof finish

    4. Parapet and roof finish

  5. Inside the new extension, ready for finishing

    5. Inside, ready for finishing

Guide prices

Typical London prices for 2026. Use the planner for your size and finish, then we confirm the price in writing after a free visit.

Single-storey, standard spec

£2,000–£3,000 per m²

About 10 to 16 weeks on site

Single-storey, high spec

£3,000–£4,500 per m²

Depends on glazing and finishes

Open the project planner

Questions about house extensions

Other services

Do I need planning permission for an extension?

Many single-storey rear extensions fall under permitted development, but it depends on your house and its size. We check this at the free visit and tell you what applies.

Can we stay in the house during the build?

Usually yes. We seal off the work area and keep a route through the house clear, and we will tell you when the kitchen or water will be off.

How long does an extension take?

Most single-storey extensions take around 10 to 16 weeks on site, depending on size and finish. You get a timeline with your quote.

Planning a house extension?